Round-A-Bout at IL-23 and I-90

In 2017, HR Green contracted inVISION Studios to produce a video simulation representing the proposed Round-A-Bout Interchange at IL-23 and I-90.  The purpose of the visualization was to present a roadway design and its ability to allow oversize vehicles, specifically 80′ tractor trailers to pass through the round-a-bouts successfully.

The production consisted of building an accurate digital model of the proposed roadway from the client’s provided plans, profiles and typical sections. The completed model included accurate pavement markings, signage, adjacent architecture, lighting, and general landscaping. No VISSIM or similar traffic data was provided, so all traffic movement was improvised with the client’s direction.